The Contractor will be required to furnish and install, through self-performance or the management of Subcontractors, the following elements of work, including but not limited to: installation of a custom sized acrylic one-piece shower pan over the existing shower pan, installation of a custom formed one-piece acrylic shower wall system over the existing shower walls, installation of a custom sized acrylic one-piece shower pan over the existing tub; conversion from tub to shower; conversion of existing tub/shower to an ADA roll-in shower; wall repair for rot/mold in walls/flooring; exposed edges capped with extruded molding, installation of new tempered glass shower doors, stainless steel grab bars, soap dish and tie-in to existing floor drain and caulking. Contractor shall remove all debris from the work site.
Solicitation #:
5831
Category:
Construction and maintenance
Issue Date:
Tuesday, October 10, 2023
Due Date:
Thursday, November 9, 2023 - 2:00pm
Cancel Date:
Tuesday, November 14, 2023
Status:
Canceled
Description:
Pre-bid meeting:
Monday, October 23, 2023, at 9:00 AM, on Microsoft Teams. Meeting link provided below.
10.23.2023 9:00am
Deadline to submit questions:
Tuesday, October 24, 2023 - 5:00pm