The Contractor will be required to furnish and install, through self performance or the management of Subcontractors, the following elements of work, including but not limited to: right-of-way infrastructure improvements including but not limited to construction of stormwater erosion control, tree protection, pavement demolition, utility demolition, new sanitary sewer and storm sewer infrastructure, temporary sewer bypass, roadway and sidewalk improvements including curb ramps and planter strip improvements. Additional parcel improvements including but not limited to construction of stormwater erosion control, tree protection, lead soil abatement, building foundation demolition, hardscape demolition, demolition of site features, overhead utility demolition, rough grading, private access drive (PAD) construction, storm drainage and site restoration.
Please see Addendum #1 for this solicitation posted on Builders Exchange http://www.bxwa.com/bxwa_toc/pub/901.html
Please see Addendum #2 for this solicitation posted on Builders Exchange http://www.bxwa.com/bxwa_toc/pub/901.html
Please see Addendum #3 for this solicitation posted on Builders Exchange http://www.bxwa.com/bxwa_toc/pub/901.html
Please see Addendum #4 for this solicitation posted on Builders Exchange http://www.bxwa.com/bxwa_toc/pub/901.html