You are here

Various Hope VI Shower Upgrades

5831Construction and maintenanceTuesday, October 10, 2023Thursday, November 9, 2023 - 2:00pmTuesday, November 14, 2023Canceled
Solicitation Document

The  Contractor  will  be  required  to  furnish  and  install,  through  self-performance  or  the  management  of  Subcontractors,  the  following  elements  of  work,  including  but  not  limited  to:  installation of a custom sized acrylic one-piece shower pan over the existing shower pan,  installation  of  a  custom  formed  one-piece  acrylic  shower  wall  system  over  the  existing  shower walls, installation of a custom sized acrylic one-piece shower pan over the existing tub; conversion from tub to shower; conversion of existing tub/shower to an ADA roll-in shower; wall repair for rot/mold in walls/flooring; exposed edges capped with extruded molding, installation of new tempered glass  shower doors, stainless steel grab bars, soap dish and tie-in to existing floor drain and caulking.  Contractor shall remove all debris from the work site.

PDF icon 5831_Various Hope VI Shower Upgrades_Addendum 1.pdfMonday, October 23, 2023, at 9:00 AM, on Microsoft Teams. Meeting link provided below.10.23.2023 9:00amTuesday, October 24, 2023 - 5:00pm