Manage our mobile devices from device acquisition through and including support, moves/adds/changes/disconnects, vendor management/ G/L coding, cost allocation, plan optimization and utilization. Vendor will identify and quantify potential savings through service provider invoice audit and service plan dvice optimization.
Informal Solicitation
SHA is issuing an Informal Solicitation for construction to perform concrete spalling repairs at our Center Park Apartments Building.
SHA is issuing an Informal Solicitation for construction to perform abatement of asbestos-containing materials on water pipes at Cedarvale Village and Jefferson Terrace.
SHA is upgrading plumbing fixtures at three buildings with water efficient toilets, showerheads, and aerators.
Fabrication and Installation of an iron anti-climb gate enclosure with security spikes at the top of the enclosure and canopy; an iron anti-climb pedestrian gate; chain link fence with two chain link fence gates; supply and installation of a pneumatic operator, panic hardware, push to activate ADA button, locking mechanisms, and a gate access control system.
SHA is an Informal Solicitation to install surge protection devices in elevator rooms at Leschi House.
Perform a Hazardous Building Material Survey (HBMS) on 103 residential units and one laundry room in Block 5 of Yesler Terrace that will provide SHA information about the location and quantity of any suspect regulated building materials that will need to be abated under a future separate contract. Also, soil sampling around each building is required to identify any lead in the soil that will need to be removed under a separate future contract either prior to or after demolition of the buildings.
The Office of Policy and Strategic Initiatives (OPSI) is seeking a branding and marketing consultant in order to develop effective strategies and tactics that communicate the significance of using housing as a platform to foster stability and self-sufficiency and design messaging that drives action among policy makers, program management, staff, clients, and partners (including landlords).
Furnish and Install a new aluminum storefront, a new aluminum swing door and door operator system to create a new security entrance, at the interior vestibule at Ross Manor’s – ‘Post Alley’ entrance. 1420 Western Ave Seattle WA 98101.
The drain line replacement project will focus on removal and replacement of the drain risers at four (4) identified locations at the kitchen sinks where the vertical drains run under the concrete slab floor.
Change to schedule of deadline dates.
Pagination
- Previous page
- Page 7
- Next page